Latest news from Kiwa

Gas Appliances Post-Brexit

BREXIT. The current situation (February 2021) for the marking of Gas Appliances (simplified rules)

Withdrawal of RPS 211

Environment Agency Protocol RPS 211 is being withdrawn. This means that after 31 January 2021 all unassessed waste from utilities excavations must be classified as hazardous, unless tested and proven otherwise

UKCA - the latest

The UK has now formally left the EU and first transition period is complete (as of 31/12/2020)  

UKCA Update

The latest on CE / UKCA Marking for gas and solid fuel appliance manufacturers from 1st January 2021,

HMG Ten Point Plan

Kiwa welcomes the 10 point plan announced by HMG this week to drive net zero carbon emissions in the UK by 2050.

UKCA Mark

Guidance from Kiwa on the UKCA Mark and what gas appliance manufacturers should do to prepare for the transition.

UKCA

Hydrogen Strategy Now

Kiwa Covid-19 Statement

The Covid-19 virus is spreading and is currently occurring in all countries that Kiwa has a presence in. Kiwa is committed to being as proactive as possible in minimising the spread of the virus by constantly reviewing at risk areas and our interaction externally, and safeguarding the wellbeing of our employees and our customers at the same time.

Waste Legislation Update

All excavated waste must be classified from 30th April 2020

The latest on Brexit

The United Kingdom has left the EU; as of the 1st February we have entered the implementation period where trade negotiations will begin on the nature of the relationship between the UK and the EU. 

Kiwa Electrical Compliance

Kiwa Electrical Compliance is the new name for Kiwa Blackwood

Building an Allergen Safe Culture (SOFHT)

Building a Safe Allergen Culture (27th February)

Read the latest Kiwa news here. You can also follow us on Linkedin, Twitter, Facebook and Instagram!